constructabilty review study

“The secret of my success is that we have gone to exceptional lengths to hire the best people in the world.”
Steve Jobs
We provide constructability studies for brownfield and green field projects. Specializing in Construction and Installation Studies of Offshore and Onshore projects with special focus on Barge selection and operations, Heavy lift studies using barge cranes over live lines/equipment, new WHT and Platform Installations Studies with float overs, Subsea pipeline installation, Liquid Sulphur and LNG Loading/Unloading Platform Installation with Heavy Lift Barge.
We conduct constructability and material handling studies for Offshore & Onshore projects ranging from pre-FEED to detailed engineering stage improving the project performance, including safety, quality, cost and schedule, through the optimal use of construction and execution knowledge in planning, design, material management and site construction. Development of construction methodology, plan and sequence, pre-commissioning and commissioning philosophy & plans and constructability review report. Development and optimization of construction schedule activities, sequence, duration and manpower.